How to supply gas to your home for free? Gas connection price in Russian regions

Our company will help to supply gas to a house in the Moscow region on a turnkey basis. We will resolve any questions you may have. We offer not only timely execution of all works, but also the best prices on the market and consistently high quality of customer service.

The problem of gasification bypasses the residents of urban high-rise buildings, since they already have electricity, water, gas and heating. Another thing is with a private house or dacha in the suburbs of the Moscow region. Starting out carry gas into the house, it is important to calculate the price in advance and select a highly qualified contractor. Often you have to deal with a very small amount of information on the Internet about the price of gas supply to a house in the Moscow region. The procedure for connecting gas to a private house requires not only construction skills. It is not enough to buy a pipe, bury it in the ground and connect to the gas supply system. To bring gas into the house, it is required to collect documentation, develop a gasification plan, go to multiple instances for approval and ensure the departure of inspectors. It is necessary to take precautions so that the gas supply process has the desired comfort, and not problems in the future.

Common way lead gas to the house- connection from the central gas main. This is possible when the house is located close to the gas network. If there is no such thing nearby, this method will be expensive and troublesome. An alternative way is autonomous gasification by using gas cylinders.

1. Price for obtaining technical conditions

To conduct gas by connecting to the central highway, it is necessary to obtain permits for the design and gasification of the house. In addition to the permit, you will need technical specifications - a document for gasification, which includes technical requirements for the gas pipeline and equipment, descriptions of the conditions for the location of the building, a list of procedures for gasification of the property. The price on the market of the Moscow region for this type of work ranges from 10,000 to 100,000 rubles. The cost determines the value of the requested maximum hourly gas consumption.
When requesting up to 5 cubic meters / hour, the price will most likely be about 10 thousand, or even free of charge, as, for example, in the company "Energo-Partner"
If the consumption is more than 5 cubic meters / hour, then you will have to perform a heat-technical calculation, the price of which varies from 10,000 -40,000 rubles.
When requesting more than 42 cubic meters / hour for residents of Moscow and the Moscow region, the approval of the limits in Gazpromtransgaz-Moscow will be required. And the application to the central office of Mosoblgaz is submitted in 2 stages. The price of such a case will be from 50,000 to 100,000 rubles.

So, in order to obtain technical specifications for gasification, it is necessary to collect the necessary documentation.
Situation one: the property has already been commissioned. To obtain a permit you will need:
a document confirming the ownership of a house or cottage (agreement of donation, purchase and sale, on the right to inherit real estate);
a document confirming the registration of the right to real estate;
act and permission for the commissioning of a house or summer house;
technical passport of the house or summer cottage.
Situation two: the object (house, cottage) has not been commissioned (under construction):
a document on the ownership of the land plot on which the object is located (a donation agreement, sale and purchase agreement, lease with unlimited rights, the right to inheritance);
plan for the location of the land plot;
permission for construction and design on this land.

2. Price for a gas supply project for a house in the Moscow region

The second step is the preparation of a project for the gasification of suburban real estate. The project is being prepared by a special licensed organization. It provides for the installation of the equipment necessary for conducting gas and is carried out on the basis of the existing technical conditions. It is important to think over the qualitative characteristics of the equipment even before preparing such a project. To select equipment, it is necessary to calculate how much gas will be consumed. The gasification project must be coordinated with the organization that issued the technical specifications. Pay attention to the requirements for rooms that are gasified: the presence of good natural light for work (the glazing area must be at least 3% of the volume of the room), high-quality ventilation. In addition, to install a gas boiler, you need a room with an area of ​​at least 15 cubic meters. The design should provide for the protection of the gas pipeline from corrosion and lightning strikes.
The prices for design again depend on the hourly gas consumption and on the pressure in the source gas pipeline. In addition, the price is influenced by the number of objects to which gas must be supplied. The cost can be viewed on the link

3. Price for Construction - Installation work

When all the documentation and design issues have been agreed upon, you can move on to the practical side of the issue - the installation of the gas pipeline. This should be done by an organization licensed to carry out such work. An agreement is concluded with such an organization and a gas supplier company, after which you can proceed to the supply of the gas pipeline to the house. These manipulations can be carried out by yourself or you can hire a special team, which will help with the paperwork and build the gas pipeline.

The price is calculated according to the project and can range from 150,000 rubles to 500,000 rubles.

Direct work on the construction of a gas pipeline consists of the following actions:

A trench with a sand cushion is dug under the underground gas pipeline;
- with the help of the basement unit, the gas pipeline goes out near the house;
- from the basement unit into the house a steel internal gas pipeline is started;
- a gas metering unit and a gas leakage sensor with a valve are installed in the furnace;
- a lowering with a tap is mounted to each gas appliance.

The gas pipeline is checked for reliability and tightness by means of pressing and holding under pressure. It is necessary to check the availability of all the necessary equipment before supplying gas to the house. After verification, an act of completed work and an act of putting the gas pipeline into operation are signed.

To start gas through the constructed gas pipeline, it is necessary to sign the following agreements: an agreement for the maintenance of the gas pipeline, for the supply of gas and for the start-up of gas. The term for signing these agreements is a month. After the successful completion of all work, the house will become truly comfortable and cozy.

Connecting gas to a private house under the new rules has removed many of the obstacles faced by the owners. Due to the monopolization of the sphere, there were no exact prices, the cost was beyond the reach of most citizens. After the changes made to the legislation, the installation time was reduced, the price level became acceptable.

But it is still a very troublesome process that takes a lot of time and effort. It is required to collect the necessary documents, make a project, sign a work contract, coordinate all issues with interested organizations. Knowing the sequence of steps, the owner is guaranteed to get rid of unnecessary worries and misunderstandings, speed up the process of gasification of the house.

Connection procedure - documentation and practical implementation

First of all, they turn to the owner of a nearby gas pipeline (usually this is a local branch of the company) to find out the possibility of a tie-in. If a positive answer is received, an application for the issuance of technical specifications is written. It contains information about the applicant: full name, name, exact address, including postal address, phone number. The planned gas consumption per hour is indicated.

Together they submit the necessary documents: a copy of the passport and a certificate of ownership of the land. It is required to provide a plan of the territory where the summer cottage is located, with reference to the nearby area. Calculations of gas consumption are given. They will not be needed if the area of ​​the house does not exceed 250 m2, this is not more than 5 m3. In other cases, specialists will help to calculate, but for an additional fee.

Resolving issues with registration

The rules stipulate that on the site and in the building, all work is assigned to the owner, and outside it - to the gas distribution company. Consequently, the owner takes actions aimed at preparing the consumer network and equipment for connection. A contractor can only be an organization that has a license and admission. It carries out all the accession measures that are fixed in the signed agreement and technical specifications.

The first step is the supplier company develops the technical specifications. They contain the following information:

  • maximum permitted hourly gas consumption;
  • time for connection work;
  • the duration of the TU.

Within two weeks, the organization sends the applicant a draft technical specification. A refusal is also possible if the specialists find out that the building is located at a distance exceeding 200 meters from the gas pipeline. Motivation in the price of work is several million rubles for one person. The way out is cooperation with other residents. If there are enough of them, the pipe will be carried out free of charge - this is provided for by the new rules.

If the owner of the house agrees with the technical conditions, he submits an application to the gas office, in which he expresses his desire to draw up an agreement regarding the connection. Within a month, the organization sends in response two copies of the agreement and the revised technical specifications. The final version contains, in addition to the initial, additional information:

  • the gas pipeline from which it is required to bring the pipe to the site is indicated;
  • pressure fluctuation limits in the consumer network;
  • gas hourly consumption standards;
  • diameter and material of pipes;
  • the customer's obligation to equip the facility with a meter.

After studying the contract, if the landlord agrees, he signs the documents, one copy is sent to the company. The agreement provides for:

  • distribution of responsibilities between the site owner and the organization;
  • deadlines;
  • demarcation of ownership between gorgaz and the owner;
  • cost and payment procedure;
  • responsibility for non-compliance with the terms.

The owner orders a gasification project for the house. This is the most expensive procedure. An agreement is concluded with an organization entitled to perform the relevant work. You can save money by contacting a gas company, but they take a long time to sell: six months or more pass. If it is urgently required, they place an order in a private company - it will be faster, but much more expensive.


A plan of the building, a list of devices planned for installation, proposed locations are provided. The production of documentation and coordination with the services, which own the various communications with which the gas pipeline intersects, are paid for. The finished document must be approved by the distribution company if the contractor is taken from outside.

Choosing it, they stop at the one whose services are not only cheaper, but also takes on the responsibility of coordinating the project with various organizations and approving it in the gas company. This is important - bureaucratic red tape can take a lot of time and nerves. You should listen to the opinion of the gas company - whom they recommend, stop at that. There will be fewer problems in the future.

Gas supply project implementation

The applicant makes the first payment according to the schedule and the turn of practical actions comes. Gas service specialists are laying a pipe from the main to the site. The cost now ranges from 2 to 5 thousand rubles per square meter, but the presidential program of gasification of a private house allows you to do it for free in rural areas.


Then comes the turn of installation and construction work in the house. It is preferable to take a team from an organization with which an agreement was concluded on the supply of pipes from the main gas network. She is registered, has a license and is responsible for the commissioning of the site, therefore she solves all the problems that arise. But gas distribution companies have no particular interest, this is not their responsibility. They are often heavily loaded and can be expected for a long time.

It is allowed to involve a third-party construction and installation organization that has an official permit for such activities. You can ask the gas workers who they recommend. Their technical supervision service accepts the work, so they know the organizations with the right to carry out the installation. Such firms often have not only teams of installers, but also a design bureau. If you order from them the production of documentation for gasification of the house and installation, you can significantly save on the total cost - up to 30%.

When a verbal agreement is reached, an agreement is signed. It specifies the obligations and guarantees of the contractor:

  • terms of work, cost and calculation procedure;
  • observance of fire safety rules by installers;
  • preparation of executive and technical documentation after completion of work.

An application for connection is being written. It contains information about the owner and the facility, the standards for the planned gas consumption, the initial data of the technical conditions. The necessary documents are attached:

  • site plan with reference to the terrain;
  • topographic map, which indicates the location of all communications;
  • property and personal documents;
  • calculation of the maximum gas consumption if it exceeds 5 m3 per hour.

When all the work is completed, they are accepted by a commission consisting of the customer, representatives of the regional gas service and the contractor. This is done within no more than one month. All equipment must be installed and connected at the time of acceptance. A test run is made, the operation of the installations is checked, a possible leak. If there are no comments, a technical supervision receipt is issued, which must be paid.


The installation organization, based on the conclusions of the commission, draws up and transfers to the company all technical documentation, where it remains in storage. When the bureaucratic procedures are over, within three weeks the gas service representative installs seals on the meter. Despite all the troubles and money, it is still worth supplying gas to a private house in order to enjoy the benefits of civilization.

Connection price and benefits

From 01.03.2014 there are new rules for connecting residential buildings to the gas distribution system. They contain the old norms and amendments that relate to the timing of work and cost. Thanks to this, the connection has become more profitable, it takes less time.

Prices vary, depend mainly on the distance of the object, but on average you will have to pay:

  • for registration of an application, obtaining a permit and primary documents - from 8 to 50 thousand rubles;
  • the production of the project will cost 3–20 thousand;
  • laying a pipe from the main to the object - 2-5 thousand per one meter;
  • tie-in into a gas pipeline - from 10,000 to 15,000 rubles;
  • a readiness check by technical supervision costs an average of 2,000.

In the regions, there is a significant fluctuation in prices. For example, in the Moscow region it is 400-500 thousand for all work. The cost is determined by the distance from the capital. In the Leningrad region, 300 thousand rubles are enough, and in the Nizhny Novgorod region - 150-200 thousand. The cheapest gas pipe in a private house will cost in the European part of Russia, on average 100 thousand rubles. Beyond the Urals, the situation is somewhat different, many settlements are located at a considerable distance from industrial centers and gas pipelines.

The region of the Far East, where there are very few highways, is problematic in this respect. Even if the main pipe is nearby, there is no need to count for a tie-in into a gas pipeline for an amount less than 200 thousand. Equipment is imported from nearby foreign countries, which affects prices. Climate diversity also makes it difficult to apply the standards that are used in other regions.

There are many benefits in Russia, but at the state level they do not apply to gasification. The federal authorities have transferred this right to the local authorities. In the regions, financial assistance for connection is received primarily by WWII veterans, disabled people, combatants, single mothers (fathers). As an example, we can cite the Leningrad Region: here 70,000 rubles are allocated to ordinary citizens from the budget, and 110,000 rubles for those entitled to benefits.

Support for the population to connect to the gas supply network of a private house is carried out in each region in different ways. Some provide preferential targeted loans, others provide monetary compensation. To get it, submit an application. All costs do not overlap, but 50% can be expected. The categories of citizens who are provided with such benefits are determined by the local authorities. To find out about their rights, they contact the appropriate administration services.

In the countryside, the presidential program plays an important role. It provides:

  • construction and reconstruction of gas distribution networks;
  • the use of energy-saving technologies for installation;
  • increasing the efficiency of the use of natural resources.

Companies are guided by federal law, the percentage of residents covered by gasification is increasing. The new rules provide for the possibility of rural residents submitting a collective application for the installation of pipes from the mainline to the sites. If it is satisfied, the approach to the settlement is free of charge. Property owners are connected to the network at their own expense.

Gas appliances for a private house

When submitting documents, it is advisable to know what equipment will be used. This is especially true for the boiler. The power is chosen, bearing in mind that for heating every 10 m2, 1 kW is required, and if hot water is used - an additional 25%. There are floor-standing and wall-mounted boilers according to the type of installation. They differ in the principle of action:

  • non-volatile;
  • consuming electricity;
  • condensing.

Installed on the base, they have a large selection of power, heat rooms of various sizes, you can connect a boiler for hot water to them. Compact wall-mounted, complete with expansion tank and circulation pump.


The operation of non-volatile gas equipment is based on the principle of natural circulation; these are the simplest devices. They are connected to large-diameter pipelines, excluding the possibility of flexible regulation of the air temperature in the rooms. The room where the device with an open-type chamber for gas combustion is installed is necessarily equipped with tidal and exhaust ventilation, a chimney.

Volatile boilers have a closed expansion vessel, a pump and a fully automated control system. This is a kind of mini boiler room. For smooth operation, it needs a constant supply of electricity. The requirements for its quality are quite stringent: the voltage in the network must be stable, differ from 220 V by no more than 10%. In rural areas with constantly changing network parameters, a stabilizer will be required.

Condensing devices are the most reliable and economical, providing the most complete gas combustion. The work uses water vapor, which gives off heat for heating. The overwhelming majority of such boilers are hinged. They last 2-3 times longer than other types, but the price is 1.5-2 times higher.


Workers make input into the house, connect gas appliances. Everything should be done in accordance with the project, no deviations from it are allowed. If the owner changes his mind, for example, with the place of installation of the boiler, this is possible only after making changes to the project, which is additionally paid. The equipment must have technical certificates.

After all the events, it is mandatory to study the safety rules for using gas. It is held at the regional office of the company. After the briefing, the safety engineer presents the log, where the signature is put. A book is handed out.

It is possible that a specialist instructs at home when commissioning works are performed. You should also sign, the document is further stored in the organization.

Main gas is by far the cheapest energy carrier in our country. Heating engineering equipment, designed for its combustion, is equipped with reliable security systems, which allows it to be operated without constant human control. That is why connecting gas to a private house is always justified and advisable. However, consumers do not always know what needs to be done to legally connect to the main gas pipeline.

Meanwhile, the procedure for connecting gas to private houses is determined by the decree of the government of the Russian Federation: "On approval of the Rules for connecting technological connection of capital construction facilities to gas distribution networks, as well as on changing and invalidating some acts of the Government of the Russian Federation"

Guided by it, the consumer must perform the following steps to connect the gas:

  • Calculate your need for natural gas and select the appropriate heating equipment
  • Get technical specifications
  • Develop a project
  • Lay a section of the gas pipeline to your house and connect it
  • Conclude a gas consumption contract

It remains to find out how to do this and how much it costs to connect gas to a private house.

How to calculate the demand for natural gas?

To do this, you need to know the area of ​​the heated room and the maximum hot water consumption at its peak consumption. To obtain sufficiently accurate results, the need for heating 10m2 of living space is assumed to be equal to 1 kW of thermal energy. This means that for a house with an area of ​​100 m2, a heating boiler with a capacity of 10 kW is needed.

Hot water supply is more difficult. When calculating the need for thermal energy, it is necessary to determine the maximum water consumption per hour and take into account that 46 kW of thermal energy will be required to heat 1m3 of water by 40 degrees (for example, from a temperature of 8 C to a temperature of 48 C).

To ensure its operation with maximum performance for an hour, a gas flow rate of 6 m3 / hour is required. It should be borne in mind that the heating equipment is operated at full capacity only in emergency situations, for example, at -30 frost and the simultaneous consumption of hot water in the kitchen and in the shower for an hour.

In order to avoid peak gas consumption for hot water supply, it is better to choose single-circuit heating boilers with indirect storage boilers. In this case, the need for gas consumption for the operation of the boiler with maximum heat transfer will be 4 m3 / h.

If such a calculation seems too complicated, it is enough just to choose a heating boiler and, according to its technical passport, determine the maximum gas consumption, to which you need to add the maximum gas consumption for the operation of the water heater and the stove.

Knowing the need for natural gas, it is possible to obtain technical specifications, but at the same time it should be remembered that the cost of connecting consumers with heating equipment, the maximum gas consumption of which does not exceed 5m3 / hour, ranges from 20 to 50 thousand rubles.

If the equipment is designed for higher gas consumption (not exceeding 500m3 / h), you will have to pay more. In this case, the exact calculation of the cost of connection is made according to a separate project.

Obtaining technical specifications for gas supply

Technical conditions are a document that indicates all the requirements that must be met to connect a private house to the main gas pipeline. So, for example, they indicate the connection point, gas pressure level, etc.
For individuals whose gas consumption level does not exceed 8m3 / hour, technical conditions are issued free of charge. If the level of gas consumption is more than 8m3 / hour, you will have to pay for the removal of restrictions in accordance with the available prices.

To obtain technical specifications, you should contact the city organization engaged in the supply of gas to the population. In Moscow, for example, this is Mosoblgaz.

Installation project development

The development of a project for connecting a gas pipeline to a private house can only be carried out by a design organization, a member of the relevant SRO. In the course of designing, a number of requirements are imposed on the premises in which it is planned to install gas equipment, which the gas consumer must fulfill without fail. If this is not done, it will not be possible to obtain a commissioning permit.

In particular, the volume of the room in which the boiler is installed must be at least 15m2 (this can be a kitchen or a specially designated boiler room), it must have a permanent ventilation system that will reduce the concentration of gas in the event of a leak. The simplest and most affordable is the presence of a window.

The door to the room where the gas equipment is installed must swing outward. This is necessary to reduce the shock force of the blast wave in the event of an emergency. For the same purpose, windows are installed in the boiler room.
The boiler room should have natural light necessary for repair work, and free access to equipment.

In order for the project not to become a "surprise" for the consumer, it is necessary to maintain business relations with the designers and find compromise solutions to emerging issues.

The finished project must be agreed with the organization that issued the technical specifications.

Gas pipeline laying and equipment installation

The construction of the gas pipeline can be started only after the approval of the project. Works can only be performed by a specialized organization, a member of the relevant SRO. At the same time, it is necessary to supervise the progress of construction work by Rostekhnadzor, where the design documentation must be registered. You can install gas equipment in the house yourself.

After the completion of construction, the gas pipeline is tested in the presence of representatives of the construction organization, Rostekhnadzor and the operating organization. About what the corresponding act is signed.

Conclusion of a gas consumption contract

To connect the gas, you must submit documents to the appropriate branch of the State Unitary Enterprise of the Moscow Region "Mosoblgaz", in the territory of the service area of ​​which your house is located.

In addition to the statement of readiness of the gas pipeline and project documentation, a passport of the owner of the house and documents confirming his ownership of it are also required. The gas connection must be completed within a month.

If this procedure for connecting gas to a private house seems too complicated, you can turn to the “one window”, which, starting from February 2014, should be open in each district division of “Mosoblgaz”, pay for the services they provide and wait for the result. The gas connection must be completed within two years.

For residents of the regions, the procedure for connecting gas to private houses is the same, only you should contact the local gas service offices.

User questions:

  • Hello! Recently I bought a house with a plot of land in the village. a gas pipeline is connected to the house. There are no supply diagrams in the documents given to me by the seller. On the site, I put a temporary structure - a barn - a metal frame sheathed with wood on concrete piles
  • We supply gas to the country house in the kitchen on the ground floor of 15m2, there are 3 windows 130x147 and two doors - the entrance from the living room and from the interior (warm in the future) corridor. Question: What width should the front door and door frame be?
  • I built a private house. from a neighboring house I was given permission to connect gas to my house, and not from the main line. it is further away. I watched the TV center where they said that new standards are being introduced. if I bring gas to the house and the number of meters
  • hello, tell me, we have gas distribution near the house and we have no project to the house. They said that the installers will make an estimate and will bring a gas pipe into the house. They came.
  • Hello .. House in the village of 160m2 owner 3 wife's mother, wife and wife's brother. Wife separated 1/3 we want to conduct gas. But what part of whom is not spelled out in the documents. There is also no apartment unit. One house, 3 owners, gas has not yet been suspended
  • Private house in the village, has a gas supply. The house is divided by inheritance into two equal parts. Is it possible to make a branch from the pipe that is connected to the house to another part of the house? If so, is it necessary to arrange a technological connection?
  • They built a house. The house is located on a plot for three owners. The neighbors have gas. The gas pipe is 3 meters from the wall of the house. If the neighbors do not give permission to connect to the pipe. Where to go next. Air connection pipe.
  • Good afternoon, we are drawing up documents for the gas supply in the village to a private house and in the gas service they told us that from the main pipe to our fence (2m) we will have to pay 28 thousand rubles, referring to the fact that, according to the new decree, everyone was equalized,
  • Is it possible to connect gas from a medium-pressure gas pipeline to a private house by air and not underground. Thanks.
  • Hello! I ask for your advice on the issue of connecting gas in the Moscow Region. The situation is as follows: on our street, 3 private houses want to connect to the gas. It is possible to connect to a private pipe. The owner asks for the connection of 300 thousand rubles. V
  • Hello. Our house is located in a horticultural cooperative, the gas was supplied for a long time. We turned to the "One Window" of Mosoblgaz to get those. conditions from us are required the consent of the cooperative to connect to the networks. Is it legal to have such a certificate
  • Hello! we supply gas to the country house in the kitchen on the ground floor (kitchen, dining room, living room - one room of about 40 sq.m.). Question: is it possible not to divide the room into the kitchen separately if the gas boiler is in the kitchen? and if not, is it possible to put
  • Please tell me what is the new resolution of the Russian Federation where it is indicated: having concluded an agreement with Gorgaz, having paid 20,000 rubles, they must supply gas to a private house within 1 year, if the house is at a distance of 200 meters
  • Hello, we have such a situation, we want to supply gas to a private house (Samara Region, Krasnoyarsk District, Svetloye Pole village). There is a pipe, about 400-500 meters from the house, they wrote an application for a permit (up to 5 kW), at first they wanted to refuse us
  • Hello! Tell me, on 1 plot there are 2 houses with different owners, in each consumption there is a boiler for 100kv / m and a stove, in general, less than 5 cubic meters / hour, from the highway to houses of 80 meters. Can we count on the laying of 1 pipe with a neighbor to connect 2x House
  • Good afternoon! The management company issues technical conditions for connecting gas to a private house with an area of ​​254 sq. M. with a limit of 1200 cubic meters / month. This limit, of course, is not enough for a house of this area. For the additional volume of gas, the UK requires payment in ra
  • Good afternoon. A small house with stove gas heating was inherited. There was no gas meter. The old house was demolished and a new one was built on this site. Since at this time we lived in an apartment, we wrote an application to turn off the gas under the plug
  • Hello! There is a plot in the village and a house on the plot! Everything is owned! Neighbors did not line up on my street, only empty lots! low pressure gas passes along the next street! We have permission to connect from the owner of the pipe! In a straight line to bl
  • When connecting a boiler or bolera to gas - is it necessary that it be connected to the water or the heating system of the house?
  • The low pressure pipe runs next to the gardening. A plant is currently under construction, to which a gas pipeline has been extended. We paid for a tee and an adapter with a plug for connecting to this gas pipeline, we were given title deeds for the given
  • Hello. Please tell me how to abandon the meter (gallus 2002), which the local gas economy imposes on us. Motivating this by the fact that somewhere a law was passed on the installation of only this meter.

It is sometimes difficult and quite expensive to bring gas to a private house. In this article, we will try to tell in all the details about the subtleties of connecting gas in a private house and the technique of laying a gas pipeline. In addition, a fairly large amount of material is devoted to the main stage of gasification - the collection and execution of documentation. It is best to use this article as a guide or memo in this process. Well, now let's go directly to the article.

When you need to cut into a gas pipeline, you should first find out who owns it. Most often it is "GorGaz". You must obtain permission from the owner to insert into the gas pipeline. When the owner of the gas pipeline has approved your application, the next step is to contact the design organization, which will have to develop a gasification project for you at home and the possibility of connecting it to the gas pipeline.





How to conduct gas to a private house?

There are only six known steps to gasify a house:

First step. Determination of technical conditions.
If you want to be able to conduct gas to an individual house, the consumer must have on hand technical specifications (TU) for the possibility of gasification of a residential building, which is issued in the city gas distribution organization. To get the data of those. conditions, you need the following documents:

  1. Write an application for the issue of technical specifications, which will indicate: the address, the volume of gas consumption, and the type and amount of gas-consuming equipment.

  2. You need a passport of the person who makes the order.

  3. Required documents for the land, which confirm your right to it.

  4. The same documents for your residential building: if it already exists, then this is the registration of ownership; and if the house is only at the stage of construction or project, you need to have a written order from the authorities, as well as a letter with permission from the Committee for Urban Planning and Architecture (CAC).

  5. power of attorney, which is notarized, to represent interests to obtain technical conditions.

  6. There should be a situational plan for a residential building or your site.

  7. if the customer wants to build a gas pipeline at his own expense, then a letter of exemption should also be made from the queue for budget gasification.

Second step. Creation of a project for a gas supply system.
All the necessary design work in private residential buildings can be carried out by those organizations that have licenses for this type of activity, this includes the design and construction departments of the GDO.

To prepare a complete project, it is necessary for the customer to prepare the following documents: explication and topographic survey of wells for the M1: 500 project, but no later than 2 years; you will need documentation for the structure and the site (all available architectural drawings for building a house and a site plan), which is also agreed with the architect in the area; type of equipment: stove or boiler; also the Act of inspection of the condition of ventilation ducts with chimneys.

The third step is reconciliation.
The prepared gas supply project, depending on the subtleties and nuances of the project, must be coordinated with the technical department and other interested organizations. It will also be the Committee for Urban Planning and Architecture; Committee, which deals with issues of improvement and road management; Department of Gardening; and also Rostekhnadzor.

Step number four. Construction of a gas pipeline.
It is important to note that only those organizations that have specific licenses for this type of activity can implement a gas supply project for your home (construction and installation work). Completion of the construction should be formalized with the Acceptance Certificate of the completed construction of the gas distribution system facility through the internal and external gas pipelines. So, the State Commission should include representatives of: a design organization, an operating organization, a customer, a construction organization, Rostekhnadzor (a representative from the gas supervision department) and the gas safety department.

Step number five. Drawing up a contract for the maintenance of the technical condition of the gas pipeline.
It is important to know that it is necessary to sign a service contract with PES GRO. Within one week, the price for the maintenance of the internal gas pipeline must be calculated. After that, you should sign the Maintenance Contract, and you can safely proceed to the next step. To conclude this contract for those. maintenance of a gas pipeline with a gas distribution station You should have the following documents with you: a full set of executive and technical documents for gas supply; a copy of the home owner's passport (pages 2, 3 and 5); one copy of the certificate of ownership of the house (this can be a technical passport for the house, a document for inheritance or purchase, but if there are no documents for the house, it is important to provide a copy of the certificate for this land plot). There must be a copy of the service and commissioning contract; a copy of the power of attorney, which is notarized (if the contract is drawn up through a power of attorney); another copy of the contract for the maintenance of automation (if the house has a gas control system); the originals of all passports for the gas equipment available in the house are also submitted.

Sixth step. We conclude a contract for gas consumption.
A very important condition is to sign an agreement so that gas is supplied to your home. You can conclude such an agreement absolutely free of charge, the consumer will need to pay only for the volume of gas received.


List of documents required to sign a gas supply contract. You should definitely have them with you.
  1. your passport (or a signed power of attorney from the owner of the house);

  2. a photocopy of a document from the SDI about your home ownership;

  3. Completed construction certificate for the internal gas pipeline;

  4. passport for the boiler, stove and gas meter.

In addition, you need to draw up an Agreement for the supply of gas, open your personal account, you will be given a receipt to make an advance payment for gas a couple of months in advance, as well as receipts for further filling. The contract will be handed over to you after the paid receipt is presented. Two copies of this Agreement must be made to be submitted to the PES.

Seventh step. Initial start-up of gas in the house.
You are obliged to sign an agreement with the gas distribution company, in which there is a question of the initial start-up of gas and a tie-in into the existing gas pipeline. After receiving permission from the gas distribution company, the customer must make a gas start-up contract, which specifies the work on connecting to the gas pipeline and starting the long-awaited gas (valve operation and ShGRP setting). To this end, the customer must come to the PES, receive a receipt for payment from the estimator, and after the payment is made, the launch day will be appointed. At the same time, there must be specialists at the facility who are dealing with the issue of setting up and starting up boiler equipment. When the house has a gas stove and according to the project, in principle, it is enough to turn on the gas; commissioning work on the boiler is most often carried out on the day of gas start-up.

How much does it cost to carry gas, and how long will this process take?

To answer this question, it is worth examining some aspects. Among them is the remoteness of your house from the common gas. The diameter of the pipe section is also important here. You should also assess whether the owners of neighboring plots will give the opportunity to conduct gas through their territory. It will be important to have their written consent that you are piping gas. Is there enough pressure in the line. How large is the area of ​​your home - the amount of gas consumed will depend on this.

Very often, problems arise with the owners of plots who want to conduct gas to their house, which is located in SNT. Often the SNT boards delay this process, because they have an interest in ensuring that the gas can only be transported centrally. In such cases, the cost of connecting gas is much higher for a member of SNT.

If gas is supplied to a site that is intended for individual construction (IZhS), then in this case the situation may be complicated by the work on the coordination of the installation of the gas main with local authorities. They can belong, for example, the roads through which your pipe will pass.

Most specialists have the following practice: the owners almost always lack any documents. Thus, help is constantly needed in obtaining these very documents, after which the gas wiring is already the last task. The price is different each time, but on average it is 200,000 rubles for the preparation of documents and another 100,000 rubles for all the necessary work.

In addition, you can distinguish between the period of gas supply to the house. When you want to conduct gas quickly, you should establish a close interaction with the available gas services. When you have no special acquaintances, this process can take several years. It is better to entrust the work to professionals.


It is important to remember that a flawed tie-in into a highway will be a criminal offense.

How can you supply gas to your dacha?

If you want to make your dacha more comfortable, not think about wood and use only natural gas, you will need to tinker a little with important documents and save up a good amount of money. It is worth remembering that connecting a gas pipe and purchasing equipment is costly. In addition, according to the law, all the costs of laying inside the garden partnership will be borne by the summer residents themselves.

The first thing that is required is obtaining a gasification permit. It is necessary with this question to go to the gas services in the area - this is Gorgaz, Raigaz or others. There you will receive all the information on the gasification conditions and a list of documents that need to be prepared for the delivery of blue fuel to the country. At the same place you will receive a form with technical specifications. Please note that it must be issued free of charge. According to the law, both verification and processing of all documents that you bring should be free.

You should contact the design organization to draw up a project. It is not worth trying to catch what is cheaper - you better pay more, because design mistakes can cost you your whole life - gas is an explosive and fire hazardous substance. Good specialists will fully study all the subtleties of your site or summer residence and, based on them, will draw up a project.

When this stage is passed, you should give the project to the workers in the gas service. Based on it, design estimates will be prepared. This service will be paid and, and it should be considered at the rates of "Glavgosexpertiza". In addition, you have the opportunity to contact a private company, where the price will be calculated according to personal criteria.


Next, you need to choose an organization that will supply gas to your dacha. When choosing a contractor, do not forget to look at his license for the possibility of gasification. It is also worth paying attention to whether the employees have experience in this area. It is important to remember that the work does not end only with the installation of the pipe. They should also install all the equipment in your dacha.

Without fail, an agreement is concluded with a contractor and an estimate is drawn up. It is also necessary to include in it the price of supplying gas to the house - approximately 5-7 thousand rubles per meter. When the partnership does not have a gas network, it will be necessary to pay for its construction.

How to carry gas to the village?

In urban apartments, natural gas will bring heat into the house, but in the countryside, most are heated, as before, either with wood or coal. But, today, the issue of gasification of the village is rather acute and, when the settlement has no plans to supply gas to the area, then its residents themselves should think about the possibility of gas supply.

You must first create a group and legally register as a consumer society.

A charter should be created, a meeting should be held at which you will choose a person who, on behalf of your community, will receive all permits for gasification of the village.


After that, your representative is obliged to submit to the regional organization an application that deals with gas distribution, on behalf of all members of society, for the possibility of obtaining those. gas connection conditions. The following documents should be added to the application:
  • documents that confirm the authority of the person that signed the letter of inquiry (written statement);

  • a copy from the master plan of the area, which indicates the location of your village;

  • documents that will serve as confirmation of ownership of existing gasification facilities or documents for land plots that need to be gasified.

After you receive the technical specification for gas connection, it is worth contacting a certain design organization to develop a connection project. Be sure to check the license and permission of this organization for such types of design.